FAQs
More FAQs- When will I be able to walk on my floors?
- Will the application process produce dust?
- How often do I buff?
Hard-surface floors treated with an acrylic finish can be lightly walked on within an hour after the last coat was applied. We recommend allowing the floor to dry for 24 hours before allowing heavy traffic on it.
Procedures that are required to prepare the floor can be done with a wet screening and/or wet conditioning pad, thereby reducing dust.
If heel marks and scuff marks become prevalent, buffing is needed.